Construction Job Scheduling Whiteboard

Track each phase of your construction project to maintain deadlines and stay on schedule

Construction Job Scheduling Whiteboard

Track each phase of your construction project to maintain deadlines and stay on schedule

  • Streamline Your Construction Project
    • Optimize project scheduling to prevent delays and maintain workflow efficiency.
    • Easily identify potential time conflicts and assign clear responsibilities for each project phase.
  • Customizable Layout
    • Rows and columns can be adapted to fit the number of project phases and timeframes specific to your industry needs

Sizes & Pricing
Step 1:Select Part # to Continue
Step 1:Select Option to Continue
Board Size H' x W'
2' x 3'3' x 4'4' x 6'
Board Size H' x W'# of Columns (dates)Row H" (# of phases)Ships Via Board with Kit
Part #Price
2' x 3'101" H (19)UPS38CA350$379.26
3' x 4'141-1/2" H (20)UPS38CA570$632.96
4' x 6'222" H (21)Truck38CA790$1,102.31
* Price includes a Supply Kit of useful accessories
Additional Information
Detailed Description

  • Whiteboard Structure
    • The first two columns display project phases on colored magnets along with contractor details
    • The remaining columns track the project timeline detailing progress in weeks, months, milestones or due dates
  • Adaptable Whiteboard Size
    • Choose a whiteboard size based on the amount of dates needed to track and the amount of info needed in each cell
  • Free Supply Kit
    • 20 Damp-Erase Magnets
      • 4" wide to fit row height
      • Comes in 4 colors:
        • 5 Yellow (6 for a 4x6' whiteboard)
        • 5 Orange
        • 5 Ivory
        • 5 Silver 
    • Black Damp-Erase Marking Pen
    • 4 Fine Point Dry-Erase Markers
    • Magnetic Eraser 
    • Hanging Hardware

Tech Specs

  • Polymer Fusion Process™
    • Heat-fused whiteboard design and colored graphics for a highly durable, magnetic surface.
  • Durable Construction
    • Three-layer construction, moisture-resistant, and guaranteed not to stain, fade, shadow, or crack. 
    • For indoor use. Class C Fire Rated.
    • Service temperature range = -10F to +160F

Options


 Our Review of Your Design 

  • Upload Your File
  • Review Your Design
    • Our in-house creative designer will create a PDF proof of your design and work with you from start to finish.
  • Final Approval
    • We DO NOT print anything until we receive your approval of the design proof.

Customer Comments:
Sizes & Pricing
Step 2:Select Part # to continue
Board Size H' x W'2' x 3'
# of Columns (dates)10
Row H" (# of phases)1" H (19)
Ships ViaUPS
Board with Kit
Part #38CA350
Price/Ea $379.26
Board Size H' x W'3' x 4'
# of Columns (dates)14
Row H" (# of phases)1-1/2" H (20)
Ships ViaUPS
Board with Kit
Part #38CA570
Price/Ea $632.96
Board Size H' x W'4' x 6'
# of Columns (dates)22
Row H" (# of phases)2" H (21)
Ships ViaTruck
Board with Kit
Part #38CA790
Price/Ea $1,102.31